Bathroom with floating double vanity, walk-in glass shower and freestanding tub

Bathroom Renovation in Costa Mesa & Nearby

★★★★★ 5.0 on Google · 65 reviews

A full bathroom renovation in Costa Mesa costs about $16,000–$38,000 for a guest bath and $30,000–$75,000 for a master bath in 2026. Construction usually takes 3–6 weeks once design and permits are done.

  • Free in-home quotes
  • Full renovations, showers & tub conversions
  • Old plumbing and leaks fixed right
  • 65 five-star Google reviews

Get Your Free Renovation Quote

We'll call within business hours to schedule a free in-home quote.

Or call (949) 669-7950 · Mon–Sat · 9am–5pm

Bathroom with floating double vanity, walk-in glass shower and freestanding tub

Mid-century bones, modern bathroom

Most Costa Mesa homes were built in the 1950s and '60s. Their bathrooms are small, often have galvanized supply lines and original cast-iron tubs, and almost never have a real exhaust fan. A renovation fixes what's behind the walls as well as what you see.

What we replace

Tub or shower, valve and supply lines, drain connections as needed, backer board and waterproofing, tile, vanity, countertop, toilet, lighting, exhaust fan and paint — with a permit and inspections when required.

Making small baths feel bigger

Clear glass instead of a curtain, a wall-hung vanity, larger tile with fewer grout lines and a recessed medicine cabinet all open up the 5-by-8 bathrooms common in Eastside and Mesa Verde homes.

Bathroom Renovation Cost

OptionTypical installed cost
Full Bathroom Renovation$16,000–$75,000
Master Bathroom Renovation$30,000–$75,000
Guest Bathroom Renovation$16,000–$38,000
Half Bath Renovation$7,000–$18,000

Updated November 2026 · Typical installed price ranges, not quotes.

65 Five-Star Reviews on Google

★★★★★ 5.0 out of 5 from 65 Google reviews

★★★★★
“The crew was very respectful and did a wonderful job. Would definitely contract them again. If hired, expect a high quality service.”
— Maximiliano F., Google review
★★★★★
“The team was friendly and did a great job. Very satisfied with the result.”
— Sonia R., Google review
★★★★★
“The team did a great job on the remodel!! I love my bathroom!”
— Camryn D., Google review

From Quote to Finished Bathroom

  1. 1

    In-home quote

    We inspect the bathroom — including signs of leaks and old plumbing — and talk through your goals.

  2. 2

    Selections & permit

    Choose tile, vanity and fixtures from our recommendations; we submit any permit needed.

  3. 3

    Renovation

    Tear-out, plumbing and electrical, waterproofing, tile, fixtures and paint — with daily cleanup.

  4. 4

    Final check

    We test every fixture, walk through the work with you and leave care instructions.

Frequently Asked Questions

What's the difference between a renovation and a remodel?

We use them interchangeably — both mean taking the bathroom down to the studs or subfloor and rebuilding it.

Will you replace old galvanized pipes?

If we find galvanized supply lines in the walls we're opening, we recommend replacing them while everything is exposed.

How long will I be without the bathroom?

Typically 3–6 weeks for a full renovation.

Your new bathroom starts with a free quote.

In-home quotes across Costa Mesa and West Orange County · Mon–Sat 9–5

Call Now